Installing a Stylish Wall-Hung Bathroom Sink (page 5 of 7)

Advertisement
 

Images from this article
javascript:void(0);
javascript:void(0);
Image Image

Steps 6 - 10



6. Cut and cement the drain line parts to fit the new center position. Join them to the existing drain line with a transition coupling. Maintain a slight slope.


7. Mark the sink height, then toe-screw 2x6 backers to the studs to support the sink bolts, cutting out more drywall as necessary. Add more backers as necessary to support the new drywall.


8. Patch the hole with drywall, then mark the positions for the sink mounting bolts. Drill pilot holes and screw the bolts into the blocking using both mounting nuts tightened against each other.


9. Tape and sand the drywall seams. Then prime and paint or tile the wall as desired. We added a 4-ft. wide column of tile from floor to ceiling.


10. Cut the water supply lines 1 in. beyond the finished wall. Slip escutcheons over the lines and snug up but don’t fully tighten the compression fitting valves.


Must Read Should Everyone Read This? Yes! I vote for this story
Share Your Comments
 
Remaining Character Count:
 
See All Comments

Advertisement
 
Related Links

Advertisement
Popular stories from the source site rd.com sorted by diggs