Planning and Preparation
Want to give your kitchen a timeless natural beauty? Put in your own tumbled stone or ceramic tile countertops and backsplash. You can choose any tile, any color and any size, but if all the choices seem daunting, do what we did. We chose a natural slate tile with predesigned accent pieces and a marble edge for a custom look.Setting kitchen tile is a project that’s definitely within reach of the average do-it-yourselfer. In this article, we’ll show you how to build your countertop from start to finish.
Our project took three days, but you might want to reserve more time. Also, plan on eating sandwiches or take-out during the process, since your kitchen will be down for several days. And don’t even think about starting it until all your tile and the new sink and faucet are on hand so you won’t have downtime waiting for special orders.
We purchased our stone tile at a specialty tile shop, which gave us the option of design help and choices we wouldn’t have considered, but you can also cruise the aisles of your home center for inspiration. We purchased all the plywood, cement board, thin-set mortar, grout and hand tools at a home center while we waited for our tile order to arrive.
This project features a new, special “tile rim” cast iron sink. It rests on top of the cement board and plywood, leaving about a 3/8-in. squared edge so your tile sits perfectly flush with the top edge of the sink for a nice, even, wipe-clean surface.
Screw Down 3/4-in. Plywood for a Solid Base
With the old countertop stripped completely off, and the
wall behind in good condition, measure your cabinets from the back wall to the
front edge of your face frame. If you have frameless cabinets, measure to the
front just behind the doors or drawer fronts. Subtract 1/8 in. from the
measurement to allow for slight deviations in the wall and then measure the
length. Transfer the measurements to the plywood and cut it with a circular saw
and a straightedge guide for a clean, even cut. Before you screw the plywood to
the top of the cabinets, attach 2x2 wall cleats to the studs where there isn’t
any cabinet support (Photo
1). If you have a dishwasher opening, cut thinner 1x3 pine to length
and screw it to the studs to make sure you’ve got plenty of room for the
backside of the dishwasher. Choose screws that will penetrate the drywall and
go into the studs about 1 in. Longer screws could hit water pipes or electrical
wires behind the wall.
Screw the plywood (drill a pilot hole) to the face-frame fronts every 8 in. and along the back of the cabinets and into the cleats as well. Be sure you have a nice, even front edge; a small gap in the back against the wall won’t matter.
Our front marble edge measured 1-7/8 in. high, so to keep the edge from interfering with the drawer fronts, we added a layer of 1/4-in. plywood. If you need to do the same, lap the 1/4 in. over the previous seam of 3/4-in. plywood near the corner for extra strength. Lay several beads of construction adhesive between the plywood sheets for a permanent bond. Staple the top layer to the one below with 1-in. staples. If you don’t have access to a stapler, use 1-in. wood screws and drive them in with your power screwdriver. Be sure the pieces are fastened every 6 in. and that there aren’t any humps in the plywood.
Next, set your sink onto the plywood top and position it carefully with your tile layout in mind (remember, you’ll be adding 1/2 in. of cement board and tile to the front edge and a layer of tile on the backsplash). Then mark it, allow for the sink rim (Photo 4) and cut it out.
Add a Solid Tile Backer for A Permanent
Installation
Home centers and tile shops carry several choices for
tile underlayment. My favorite is old-fashioned cement board. This stuff is
dense and impervious to water, and it will last for decades. It may be a little
more difficult to work with than other materials, but it cuts fairly easily
once you get the hang of it.
The secret to a solid foundation for tile is to bond the
cement board to the plywood below. Mix up a batch of latex-fortified (check the
label) thin-set mortar to a soft, mashed potato consistency. Trowel it onto the
plywood (Photo
7) with a 1/4-in. notched trowel and then embed the cement board
right into the mortar. Screw it every 8 in. to the plywood below with 1-1/4 in.
cement board screws. The mortar will fill any voids between the surfaces and
bond them into a monolithic surface.
TIP: To cut
narrow strips of cement board, score both sides and gently pry up the edge.
Once the top surface is covered, cut cement board strips to cover the exposed plywood edge. Again mix a small batch of thin-set mortar, spread it over the plywood edge and push the cement board into the edge. Nail the edge (Photo 8) every 6 in. to hold it in place. Next, apply fiberglass mesh tape over the corners. Just peel the mesh off the roll and press it over the corner edges (Photo 9). Once the mesh is in place, trowel a thin layer of thin-set mortar over it. Let the mortar set up for a few hours before continuing.
Check Your Layout One Last Time
It’s best to draw lines right on the top using a framing
square as a guide. Before you mix your thin-set mortar, place the tiles and
determine grout line widths. If you have an inside corner like ours, start your
pattern there so you’ll be sure it will track symmetrically from this point in
both directions. You’ll notice in
Photo 10 that
we marked our decorative border coming out from the corner and then determined
how much we needed to cut from the first row of field tile. Plan cuts and the
positions to avoid thin pieces. Shift your pattern as needed.
Also check the backsplash layout at this time. Never have the grout lines “almost” match up with those in the countertop. It’ll look like a mistake. Either follow the grout lines of the countertop or offset them by half a tile. See what works best for your situation.
From your layout, you’ll be able to predict several cuts that you can make ahead of time. Don’t precut all the tile. Wait and see how things look at the end of the run.
Cutting the Tile or Stone
I rarely use a score-and-snap tile cutter these days,
since wet saws are so available and cheap. Besides, most stone and thick, dense
ceramics won’t cut with a score-and-snap method. We bought an inexpensive ($80)
tile saw that worked great for this job. However, the small, 4-in. blade was a
drawback when we cut the thick stone edging. We had to cut it one direction
halfway through and then flip the piece and complete the cut in the other
direction. Otherwise we were more than happy to use the small saw instead of
renting a larger one (about $45 a day) so that we wouldn’t feel rushed.
Tile the Top in Workable Sections
Mix some latex-fortified thin-set mortar in a plastic
pail to a smooth, mashed potato consistency. Mix enough (about a quart) to
cover about 6 to 8 sq. ft. at a time. Spread the mortar with a 1/4-in. notched
trowel, leaving your layout lines exposed to guide the tile placement. Start
setting the tiles. Place them on the mortar bed and lightly press them into
place. Pay close attention to the grout spaces and use tile spacers if
necessary to maintain even grout lines. Our slate tile varied slightly in size,
so we decided to just “eyeball” the spacing to maintain about 3/16 in. between
the tiles. It’s OK to shoot from the hip like this with a rustic-looking
countertop like ours.
Once you’re finished with one section, take a close look at the tile, check the spacing and look for any crooked tiles or extra-wide or narrow grout lines. If it looks good, mix another batch of mortar and tackle the next 6- to 8-sq. -ft. section. Continue this until you lay all the field tile in place, and scrape away any excess mortar where you’ll be running the front accent border. Take a break.
Lay the Accent Border After the Field Tile
Lay out your pieces for the accent border (Photo 12). Lay
them end to end and figure where the best spot on the sheet may be to splice
the sections. These sections are placed on a backing to maintain the pattern
and correct spacing. Keep in mind that if your border allows it, you can even
miter the sections with your wet saw.
As you did with the other pieces of tile, spread your mortar and embed the accent tile. Once you finish setting all the tiles and the mortar has had a few hours to set, go back with a utility knife or wood chisel and lightly scrape away any mortar that may have oozed proud of the tile or caught on the edges.
It’s a lot tougher once the mortar dries hard as concrete, so a bit of attention now will ensure you won’t see ugly mortar patches on your nicely grouted surface later.
Clamp a Ledger to Support the Front Edge Pieces
Clamp straight 2x2s to the front of your cabinets as
shown in
Photo 13 to act
as supports for the heavy edge pieces. For the sides, cut some return 2x2
pieces and screw those to the overhanging front supports. To support the
backside of the returns, cut some upright supports and place them against the
walls.
Cut the mitered angles of tile edging on your wet saw. First set them in place and then mark the locations of the rest of the pieces by placing them end to end. If you end up with a small piece in the inside corner, you’ll need to cut a few inches off the outside corner piece to avoid the “tiny tile” look.
Once you’ve got the pieces cut, butter the backside of your pieces with mortar and stick them to the front edge. You may need to use small tile shims (available at your tile store) to lift some pieces slightly off your temporary ledger for a nice, straight edge. When you’ve finished laying the edge pieces, look down the edge from end to end and straighten them if necessary. If the heavy edge pieces want to fall or tip, support them with masking tape from above. Let these tiles set overnight before going any further.
Set Your Backsplash Tile
Again, check the layout and mark the back wall with a
fine-tip marker. Check your pattern and make cuts if you need to downsize the
first row. Mix some mortar and trowel it onto the wall just high enough for the
first two rows on one section. Lay the first row and remember to leave a small
1/8-in. gap between the countertop and the first row. Because gravity works 24
hours a day, you’ll probably need spacers to keep the tile from sliding.
Position the tiles and gently tap them with the side of your fist to set them
as you go. When you get to an electrical receptacle, mark the piece in place
(lower left
photos) and cut it on your wet saw.
Start setting the second row and add spacers to keep the tile in place. With the second row complete, keep tiling and add your pattern pieces as your layout demands. Remember, you can stop at any point as long as you clean the mortar from the wall along the edges you’ve just laid. Stop every once in a while and look for sags, goofs or oozing mortar. They’re easy to fix now.
If You Have Porous Tile or Stone, Seal It Before
Grouting
Once the mortar has set overnight, pick up sealer at the
tile shop (ask for the right stuff for your tile). Roll or brush the sealer on
and let it dry for about an hour before grouting. (You can skip this step if
you have fully glazed tile with a matte or gloss finish. ) The sealer
penetrates a porous finish (Photo 14) and prevents the grout from being
absorbed. If you don’t seal porous tile and stone, it will absorb grout and
look hazy no matter how many times you scrub it.
Mix your grout to a toothpaste consistency according to the manufacturer’s guidelines. Some grouts have a special latex additive, while others mix only with water. It’s best to mix just what you need. Mix about the volume of a quart and scoop a lump out about the size of a baseball. Push it into the spaces between the tile with a grout float. Work it in from several directions and squeegee the excess off with the edge of the grout float.
When you’ve filled about a 6- to 8-sq. -ft. area, start wiping it with a clean, damp sponge. Rinse out the sponge in clean water and keep rotating it to a fresh, clean side. Change the water in your pail often! Don’t have the sponge too wet. You don’t want to constantly add water to the grout and weaken it. This also shapes the grout lines. Take care not to wipe too much out. Once you get the tile or stone clean, move on to the next section and repeat the process.
Look back and check for grout haze where you started. Wipe the tile or stone with a clean, dry cloth if you detect a slight haze. You may need to use a little elbow grease to get it clean.
Cover Countertop With Cardboard As You Grout the
Backsplash
Apply the grout to the walls the same as you did for the
top. You’ll notice we left our faucet off while we did the grouting. We found
it a lot easier to get behind the sink and wipe the grout. Once you’re finished
but while the grout is still soft, dig out the grout between the backsplash and
the countertop. The grout here will most likely crack after a few weeks, so
it’s best to get a color-match caulk and fill the gap the day after grouting.
The caulk will flex a bit as your house expands and contracts slightly with
seasonal changes.
Keep Your Grout Looking Good With a Sealer
Wait three days for your grout to cure and then apply a
grout sealer as you did before. The sealer will penetrate the grout and help
block food and juice stains. Apply the sealer liberally to the surface, let it
be absorbed and then wipe away the excess with a clean, lint-free cloth. In a
year or so, you can purchase special grout cleaners at your tile store and
apply them. After you clean the grout, follow it with another coat of sealer.
Buyer’s Guide
You can purchase a sink like ours from a Kohler dealer
near you. Just go to www. kohler.com or call(800) 456-4537.
Our stone tile is manufactured by Jeffrey Court Inc. Visit the company’s Web site at jeffreycourt.com or call (909) 340-3383. We used 6 x 6-in. Sedona tumbled slate, 3 x 12-in. Rustico Block trim, 4-1/4 x 12-in. Diagonal Dots and 2 x 12-in. marble edging.




Advertisement






















