Image 2 of 17
2. Erect a temporary 2x4 support wall if the joists are perpendicular to the wall you’ll be cutting. Place it 3 ft. back from the concrete wall. Screw the top plate to the joists and align the studs directly under the floor joists. Measure and cut each stud for a tight fit.