About This Project
Stonework doesn’t have to be complex or require special masonry skills. In most regions, you can buy flat flagstones that you can easily lay for paths and stack for solid stairs. We’ll show you how to plan, lay out and build a set of natural stone steps using flat flagstones for the treads and solid blocks of stone, called wallstone, for the risers.
Our steps are built on a gradual slope, but by changing the riser and tread sizes you can build them on slopes as steep as about 40 degrees. Rustic steps like these are well suited for informal garden paths like ours, but we wouldn’t recommend them for entry or other steps that get heavy daily use.
In addition to the basic gardening tools, leather gloves and carpenter’s level, you’ll need a few special tools for breaking and moving stone. Buy a 4-lb. maul for about $8 to chip and break stone. If you have to cut a few stones, buy a dry-cut diamond blade, available at home centers for $40. To move the stone, rent ($12 per day) or buy ($40 to $100) a two-wheeled dolly with large wheels.
Project Facts- COST: $1,800 (5-1/2 tons of stone)
- TIME: 2 or 3 weekends
- SPECIAL SKILLS: None
- SPECIAL TOOLS: Two-wheeled dolly, diamond blade, 4-lb. maul
- LOCATION: Slopes to 40 degrees
- Dry-laid stone (no mortar)
- No complex step calculations
- Basic tools
- Easy to adapt to your own yard
Stone Steps Don’t Have To Be Exact
Make a rough sketch of the plans for your steps,
including the approximate number of risers and any retaining walls you might
have to build.
Begin by measuring the total horizontal distance the stair will travel along a level line. This is called the “run” of the stair. Then measure down from this level line to determine the total vertical distance, or “rise.” Your goal is to arrive at a set of comfortable steps with rises of 6 to 8 in. and treads at least 12 in. deep.
First figure out how many step risers you’ll need. Gentle slopes like ours require short risers and long treads, while steep slopes require taller risers (up to a maximum of 8 in. and short treads). If your hill has both steep and gentle slopes, break it up into sections and calculate the step layout separately for each area. Divide the total rise by about 6 in. for shallow slopes, up to a maximum of 8 in. for steep slopes, to arrive at the approximate number of risers. In our case, the total rise was 29 in. Dividing by 6 yielded 4.83,which we rounded up to 5 risers.
Subtract 1 from the number of risers to determine the number of treads. Then divide the total run by this number to arrive at the depth of each tread. We divided the total run of 145 in. by 4 treads to arrive at a tread depth of a little more than 36 in. Using this information, mark the location of each stair riser on the ground with spray paint.
Buying and Installation
Buying Stone
A visit to your local stone supplier is the quickest way
to find out what types, sizes and shapes of stone are available in your area.
Look for flat stones called flagstones that range in thickness from 2 to 3 in.
to use for your treads. Ours are limestone, but you may find that another type
of stone is more readily available. You’ll need some 6- to 8-in. thick blocks
of stone, called wallstone, for the risers.
Follow our instructions for figuring your riser height. Then
pick out wallstones of this height to use for your risers. Try to find
flagstones of consistent thickness. It will make it easier to keep the stone
steps all the same height.
Since stone is usually sold by the ton, and the number of square feet a ton will cover depends on the thickness of the stone, figuring quantities is best left to someone with experience selling natural stone. Note the dimensions on the sketch and take it with you to order the stone. Order about 15 percent extra to provide more shapes to choose from and avoid having to pay for a second delivery. You’ll have no trouble finding uses for the extra stone.
Our project required about 3 tons of stone for the treads and landing and another 2-1/2 tons for the risers and wall. In our area, stone costs about $250 to $450 per ton plus $100 for delivery. In addition to the stone, order 1 ton of crushed gravel with aggregate 3/4 in. and smaller for leveling the treads and risers.
Start With Level Risers
With the tricky planning out of the way, you’re ready to
dig in and start building steps. Spread out some of the stone so you’ll have
many shapes to choose from. Then build one step at a time, starting at the
bottom and working your way up.
The first step is the trickiest to build. After that you just repeat the process until you reach the top. Set the first riser in place. Remember to bury it a few inches so the first riser won’t be too tall. Now use the top surface of this riser stone to guide your shovel as you dig straight back into the hill to make a level spot for the first tread and the second riser. Be sure to dig out all of the sod. When the first two risers are in place, you’re ready to set stones for the first tread. Pick larger stones to overhang the riser. The extra weight will keep them from tipping. Then fill in behind them with smaller stones.
For a safe set of steps, it’s important to keep all the risers the same height. Compensate for variations in flagstone thickness by adjusting the height of the riser. If the stone you pick for the tread is extra thick—say, 3 in. rather than 2 in.—bury the riser an extra inch so the total rise will be consistent. The same goes for keeping the top surface of the treads even. Put a little gravel under thin stones to raise them, or excavate under stones that are too thick. If a stone tips or rocks when you step on it, shim it with stone chips. Take your time adding gravel and removing soil until your step is just right. Then move on to the next one.
To avoid moving stones more than necessary, we found it helpful to arrange the stones into the shape of the treads near the stone pile, and then move the pieces to their permanent location on the steps.
Blend The Steps Into The Landscape
Notching into the hill will leave bare ledges of
soil along the edge of each tread. You can either remove soil to slope the
surrounding landscape down to the steps or add stones along the edge to retain
the soil. On the three steps leading from
the landing to the top of the hill, we buried wallstone along the edge to hold
back the dirt.
Filling the cracks between stones is the final step in the project. Experts we talked to had varying opinions on the best material to use. Sand is easy but it will wash out. Pea gravel looks good but tends to fall out and get under your feet, and it’s like walking on ball bearings. We settled on a 50/50 mix of compost and soil. It packs easily into the cracks and looks natural. And if you want, you can plant a durable creeping ground cover, like creeping thyme, in the large spaces. Besides looking great, it will fill in the spaces to keep out weeds and hold the soil in place.