Planning and Preparation
This small deck comes with big, eye-catching features that make it seem twice the size. We combined traditional decking with a natural-looking stone wall to limit foot traffic and get full use of the space for relaxation. The stone wall is set at a perfect bench height, so you have plenty of built-in seating. In addition, the manufactured stone veneer has the massive look of a solid stone wall but is much lighter and easier to build with. The wall looks great, needs almost no maintenance and will last for decades.

Click image to enlarge.
We’ll show you a foolproof way to lay out and construct this ground-level deck, and simple steps for preparing and installing manufactured stone walls.
This deck project is great for both intermediate and advanced do-ityourselfers, since it requires only basic skills with hand and power tools. But you will need help lifting the heavy wall caps into place. Allow three or four full weekends for you and a helper to complete it.
Our deck has two platforms that connect to doors on different levels and provide for a gradual transition down to the yard. The main deck is about 14 ft. square and the second is slightly more than 8 x 9 ft. The materials for the platforms cost about $1,600, or $6 per square foot. To add that grand look of stone, expect to spend $2,000 more. This translates to $59 per linear foot of stone wall.
You’ll need basic carpentry, concrete and masonry tools to build this project. You probably have the carpentry tools: circular saw, drill, hammer and level. The concrete and masonry tools (Photos 10 – 19) are relatively inexpensive. You could buy most of them for under $50 total, or borrow them from a friend or neighbor. The one somewhat expensive tool you’ll need is a 4-in. grinder ($75) for cutting the stone (Photo 17). But you could accomplish the task using a 7-1/4 in. diamond blade with your circular saw. Finally, round up a posthole digger, a shovel and a wheelbarrow.
FIG. A: Deck Frame Dimensions and Materials

Click image to enlarge.

NOTE:
All framing lumber and plywood is pressure treated
(P.T.)
Planning and Buying
Tips
Draw out your plan in detail (or modify
ours) and make a list of your lumber and other materials. Then shop at a
full-service lumberyard and plan to have it all delivered. This will allow you
to concentrate on building the deck rather than running to get the next load of
materials. The framing is .40 pressure-treated wood and the decking is
cedar.
Manufactured stone comes in a variety of colors and styles, ranging from random fieldstone to rectangular-cut slate. The stone we selected (“Country Ledge Mississippi” by Boulder Creek Co.) has the look of weathered limestone. The stone is actually lightweight concrete poured in molds cast from real rocks. It’s durable even in harsh climates and made to last for more than 30 years. Buy it from brick and stone suppliers. Look in the Yellow Pages under “Stone” or see the Buyer’s Guide below for manufacturers that can direct you to a retailer in your area.
Buy your mortar from your stone supplier as well. It’ll carry the stuff the pros use. These mortars tend to be more workable than varieties found at home centers and will give you consistent results.
Before you have any materials delivered, submit your plans to the local building department. The stone wall adds considerable weight, so if your plan varies from ours, hire an architect or structural engineer to calculate footing locations and sizes. (It’ll cost about $150.) The inspector will check the strength of the framing and issue a permit. It’s not uncommon for an inspector to make minor changes in a plan, so be prepared to adjust your lumber order if need be.
Set the
Ledger to Get Things Started
The first step in constructing our deck
was to cut the siding away from the house and fasten the ledger board
(Photo 1).
Cutting into your house might make you a little nervous. But if you follow our
tips and measure carefully, you won’t ruin anything.
FIG. B: Ledger Detail
Position the top of the deck about 1-1/2 in. below the
threshold to keep snow and water out of the house. Snap a level line on your
siding 1/2 in. above that height for siding clearance. Then measure and mark
the ends of the ledger according to your plan. If your siding is wood, set your
circular saw to the depth of the siding and cut the top and sides. Then pry the
siding off. If you have vinyl or aluminum siding, you may be able to cut it off
with several strokes of a utility knife, or use a circular saw with a plywood
blade. Another alternative is to simply remove a section of siding (as we did),
cut it and replace it later, replacing the bottom and side channels as
needed.
If you have brick, stucco or block walls, you can skip this step and hang the ledger board directly against the face of the masonry.
Select straight 2x10s for the ledger and outer beam. Cut them to length, then lay them side by side and, following the plan, mark the joist locations using a tape measure and square (Fig. A).
Tip: Place an “X” on the side of the line where the joist will sit.
Lag-screw the ledger board to the house rim joist (Photos 1 and 2). Check local codes if you’re fastening into concrete or brick. Be sure to slip a piece of deck flashing, available in 10-ft. lengths from your lumberyard, on top of the ledger board and under the siding. (Some pros like to slip it under the building felt as well.) You may have to pull or cut a few nails to slip the flashing in place. Overlap additional lengths 2 in. and seal the seam with silicone caulk.
How to
Pour "Dead-On" Footings
Misplaced footings are the most common
mistake in deck construction. Use the method shown in
Photos 3 and 4
and you’ll get exact footing placement on your first try.
This deck has only six footings, so you can dig them using a manual posthole digger. If you have more, consider renting a gas-powered auger. Dig them to the size approved on your plan and to the frost depth in your region (Fig. C). In most regions, the building inspector will want to measure the depth and width of your holes before you fill them.
Before pouring concrete, reassemble the deck frame and attach the anchors (Photo 5). If you feel confident in your concrete finishing skills, go ahead and order a truckload of concrete and pour the footings and wall caps at the same time. (See “Pour Concrete Caps”). For our footings and caps, we ordered 1-3/4 cu. yds. of concrete, allowing about 10 percent extra for comfort. The pace is fast when you have a truck on site. Be sure to have at least two extra people to help.
If you’re a little unsure of your finishing skills, mix bagged concrete for the caps and footings. It’s more work, but it will allow you to move at a more relaxed pace.
When you pour the concrete into the footing holes, work it in with a stick or the handle of a shovel to fill any voids. Then, using a trowel, strike off the top even with the bottom of the framing.
Framing
Goes Fast
With the layout complete and the concrete
set, the framing goes fast. Cut all your joists to length and slip each into
the hangers (Photo
6).
Tip: Label any bow (crown) with an arrow pointing up. When you install the joist, always set the crown up.
Check that the top sits flush with the beam and ledger. If you have to, slip a treated shim between the hanger and the joist to raise it, or knock a little off the bottom with a chisel to lower it. Blocking (Photo 6) stiffens a deck that has long joist spans. It’s now time for your framing inspection.
FIG. C: Footing and Wall Framing
NOTE: P.T. means
pressure-treated.
FIG. D: Framing and Step Details
You’ll see the terrace effect take shape
as you construct the knee walls (Photos 7 and 8). Using a circular
saw, cut your 2x6 studs 18 in. long. Measure for the length of the plates
directly off the deck frame, not by referring to your plan. Nail the studs
every 16 in. between the plates with 16d galvanized nails. Then attach the
plywood, using the factory-cut edge to square up the walls, and tip them up
(Photos 7 and
8).
Prep the Walls With a Solid
Mortar Base
First staple No. 30 asphalt felt to the
plywood and wrap it over the top. It goes on a lot faster if two people work
together, one unrolling as the other staples. Overlap any joints by at least 6
in.
Nail up galvanized mesh next (Photo 9). Be sure to wear heavy gloves to protect your hands—this stuff is sharp. Cut it with regular metal-cutting shears. Some types of wire mesh have little bumps on the back every 8 in. or so to space the mesh away from the wall (Photo 9). Put the bumps against the wall.
FIG. E: Knee Wall Framing
Mix up the mortar and apply it to the
wall. Wear gloves and goggles to protect your skin from the caustic cement. Mix
the mortar two or three bags at a time in a wheelbarrow with a short,
flat-nosed shovel or a hoe. Add water slowly to the dry mix until it reaches
the consistency of whipped cream. Then mix it aggressively for five minutes.
Let it rest for a few minutes before you start applying it to the wall. Test
the consistency by drawing the shovel back and forth in the mix. It should have
a creamy texture yet still hold its shape when you spread it onto the wall
(Photo 10).
You’ll know immediately if the consistency is right. If the mortar is too wet,
it’ll drip all over the place and fall off the trowel. If it’s too dry, it will
be difficult to press into the mesh and it’ll peel off as you slide the trowel
across it. Add mortar mix or water as needed.
FIG. F: Stone Wall Details
Apply the mortar quickly. A helper is
crucial to keep a fresh supply mixed and ready to go. Keep the wheelbarrow out
of the direct sun to prevent the mortar from drying out.
The next step is to “scratch” horizontal grooves into the mortar (Photo 11) after it firms up slightly. Use a special tool called a “scarifier” ($7) that’s available at stores that specialize in masonry tools, or simply a steel-tined garden rake. The important thing is to set horizontal grooves to provide a good bonding surface.
Cover the mortar scratch coat with plastic and let it harden and dry for two days before applying the stone.
Apply the Decking While the
Mortar Cures
We selected 2x6 cedar decking for this
project for its natural look, but you could also use one of the new
plastic/wood composites for extra durability. Start by attaching the riser trim
to the lower step (Fig.
D) then the 2x8 tread to the top on the lower platform. A
1-1/4 in. overhang on the tread creates a shadow line, making an attractive
step. Then work in toward the house, spacing the 2x6 boards with the casing
nails. Put the best-looking side face up. Start with a good, straight board and
align the others with it. To straighten a bowed board, lay it with the arc
against the installed one. Nail one end and work to the other, prying the board
straight with a chisel as you go (Photo 12).
FIG. G: Hawk
As you get within 3 ft. of a wall, measure
the remaining distance to see if it’s equal on both ends. If not, stretch your
spacing slightly between the boards to make the last board at the house (and at
the stone wall) even. You’ll probably have to rip (cut the long way) the last
board to width.
Apply the riser trim to the upper step and nail on the 2x8 tread (Photo 12). Then lay the first board against the house, ripping it to the width of the final board on the lower deck to make the decking line up. Butt the ends of the deck boards up tight to the treads, but leave the other ends about 1 in. from the knee walls so water and debris can fall through. The stone will cover this gap once installed. When you’re done decking, place cardboard over the surface to protect it from scratches and mortar stains while you’re working with the stone.
Setting Stone and Pouring Concrete
Watch Our Pro Set
Stone
Applying the stone is the most creative
and enjoyable part of the project. It’s half art and half technique. First snap
level chalk lines 6 in. apart on the face of the walls, measuring up from the
bottom of the wall (Photo
13). Use these lines as a guide, not an absolute reference, to keep
the stones level as you work. Next spread a generous amount of stone out on
scrap plywood to keep it clean and dry. Select stones from different boxes to
get a feel for the various shapes, sizes and colors you’ll be working with.
Start at the bottom of an outside corner first and apply the special corner
stones. Work your way toward the top in a pyramid fashion (Photos 13 and
16). In the last 12 to 18 in., search for three or four stones that
will end flush with the top, by dry-fitting them in place (without mortar). As
you select a stone, always think about how the next one or two pieces will fit.
Try to fit as many pieces as possible without cutting. It’s a bit of a puzzle.
You can cut stone if you have to, but it’s dusty, it slows down the work, and
the cut edge doesn’t look quite as natural as the cast edge.
To cut the stone, use a hand-held grinder with a diamond blade (Photo 17). Hold the stone in place and mark it, allowing 1/2 in. on each side for the joint spacing. Then make your cut with the face of the stone up. Wear a dust mask and hearing protection while you cut.
Adhering the stone is a three-step process (Photos 14 – 16). First you “parge" the stone (press mortar into the back of the piece), then apply a second layer evenly across the back and finally, press the stone in place.
Be sure the scratch coat is dry before you apply the stone. The stone must also be dry, so protect it from moisture. Don’t even consider installing it on a wet or drizzly day.
Tip: Add about a quarter of a shovel of Portland cement to three bags of mortar mix to richen it up a little. This is our pro’s secret, for your eyes only!
Keep the mortar at a stiff whipping cream consistency. As you work, it will dry out, so add a little water now and then to keep it workable. Throw out leftover mortar after a half hour and mix a fresh batch.
Begin on the least conspicuous wall first to get the hang of it. Step back from the wall occasionally to be sure the colors blend well and the shapes and sizes are spread evenly throughout the wall. Resist the temptation to put the stone in rows all the same width. Break rows up fairly often with a larger piece. Stagger your vertical joints. Aim for about 1/2-in. joint spacing, but don’t get obsessed with individual pieces.
When you set the stones on the inside walls, keep them 1/4 in. off the deck surface to allow for airflow and to prevent rot.
With the stones set, finish the joints by grouting (Photo 18). Use a grout bag ($6) to fill the joints with mortar, like squeezing frosting from a pastry bag.
Tip: If the bag you’re using has a metal tip inside, remove it. The tip tends to clog with mortar.
Mix the grouting mortar a bit more moist than you did for setting stone. Fill the bag using your trowel and give it a test squeeze. The mortar should be thick but flow rather than clog up. It takes some effort to force the mortar out of the bag. Your forearms will feel the strain after a while. Work quickly. If you drip mortar on the stone, let it dry before you brush it away. If you wipe it now, it’ll smear and stain the stone.
In 15 to 60 minutes, the mortar should stiffen to “thumbprint" hard (a thumb barely leaves a print when you press into it). Then rake away the excess with a pointing trowel (Photo 19). When raked, it should fall away as moist crumbs. After you rake a few square feet, lightly brush away any excess with a whisk broom. If the mortar smears, let it harden longer.
Setting the
Caps
Lift the caps into place (Photo 20).
These caps are heavy, so work carefully. Clean the work site to avoid tripping,
and lift with your legs, not your back. Check for level, and then if necessary,
wiggle on one end or the other as you press down to level the cap. Immediately
check to make sure your overhang is even on all sides. The mortar grabs pretty
fast, so work quickly. As you work, sight down the wall to make sure the caps
are straight. Give each cap a 3/8-in. gap and later fill it with mortar to 3/8
in. from the top (Fig.
H). After the mortar dries, fill the remaining gap with a gray
urethane caulk to form a watertight seal.
All that’s left is to put a quality sealer on the decking to protect it. Bring on the furniture, then sit back and enjoy a well-deserved break!
FIG. H: Cap Joint Detail
FIG. J: Concrete Cap Dimensions

Click image to enlarge.
Boulder Creek, Dept. TFH, 8282 Arthur St., Spring Lake Park, MN 55432; (800) 762-5902. www.bouldercreekstone.com
Coronado Stone Products, Dept. TFH, 11191 Calabash Ave., Fontana, CA 92337; (800) 847-8663. www.coronado.com
Cultured Stone, Dept. TFH, P.O. Box 270, Napa, CA 94559-0270; (800) 255-1727. www.culturedstone.com
Materials ListFootings and Framing
|
ITEM |
QTY. |
|
12" dia. x 48' long cardboard forming tubes |
6 |
|
Concrete |
1 cu. yd. |
|
Mudsill anchors |
6 |
|
2x10 x 14'; treated joists, ledger and beam |
21 |
|
2x6 x 10’ treated ledger and beam |
3 |
|
2x6 x 8'; treated joists |
8 |
|
2x10 joist hangers |
30 |
|
2x10 end joist hangers |
2 |
|
2x6 joist hangers |
14 |
|
2x6 double beam hanger |
2 |
|
Joist hanger nails |
5 lbs. |
|
3-1/2" 16d galvanized box nails |
10 lbs. |
|
4" x 1/2" lag screws with washers |
28 |
|
3-1/2" lag screws with washers |
26 |
|
2" lag shields* |
26 |
|
10’ pieces of deck flashing |
3 |
|
2x6 x 14’ cedar decking |
31 |
|
2x6 x 10’ cedar decking |
18 |
|
2x8 x 10’ cedar treads |
2 |
|
3-1/2" galvanized casing nails |
15 lbs. |
| * |
Optional for attaching the rim joist to concrete or masonry |
|
2x6 x 14’ treated plates |
5 |
|
2x6 x 12’ cut for studs |
5 |
|
4x8 x 1/2" treated plywood |
8 |
|
30-lb. asphalt-impregnated building felt |
2 rolls |
|
1/2" staples |
1 box |
|
27" x 8’ galvanized wire lath |
14 pieces |
|
1-1/4" galvanized roofing nails |
5 lbs. |
|
80-lb. bags premixed mortar |
30 |
|
80-lb. bag Portland cement |
1 |
|
Manufactured stone “flats" |
145 sq. ft. |
|
Manufactured stone “corners" |
14 lin. ft. |
|
4’ x 8’ x 3/4" birch plywood |
3 |
|
2x4 x 8’studs |
14 |
|
3" drywall screws |
1 lb. |
|
1-5/8" drywall screws |
1 lb. |
|
10’ x 3/8" rebar |
10 |
|
Concrete |
2/3 cu. yd. |
Pour Concrete
Caps
Some manufacturers make special capstones for topping off these
walls, but for a smooth, more durable finish, we recommend making your own
concrete caps. Here’s how.
Cut and assemble the forms according to the sizes in Fig. J, p. 1. When designing your own caps, limit lengths to about 3 ft. (150 lbs.!) Beyond that they get too heavy to carry safely. Screw together everything so you can remove the 2x4s easily.
Follow Steps A – E. The biggest mistake is to tool the concrete too soon, before the water that comes to the surface has time to reabsorb.
Concrete Cap Mold

Click image to enlarge.
A. Cut the
2x4s to length and screw the ends together with 3-in. drywall screws. Toe-screw
(screw at an angle) the sides to the 3/4-in. plywood base every 12 in. with
1-5/8 in. screws. Cut the 3/8-in. rebar to length with a circular saw and a
metal-cutting blade.
B. Fill the
forms one-third full with concrete, drop in the rebar, then finish filling the
forms. Work the concrete into the corners and sides with the blade of the
shovel as you go.
C. Level the
excess concrete flush with the top of the form, then hit the sides of the form
sharply with a hammer to eliminate air pockets. Quickly smooth it with two or
three swipes of a magnesium trowel. Let the concrete set until any water that
rises to the surface disappears and the concrete is “thumbprint" stiff. Then
tool the edges with an edging tool to round them over. Finally, smooth the
surface with a steel trowel.
D. Unscrew one side of the form when the concrete
stiffens. This may take as little as 30 minutes or as long as three hours. If
the concrete holds its shape (doesn’t sag), smooth the side with a steel
trowel, filling in any voids left in the concrete. If the concrete slumps, put
the form back in place and let it set longer. Otherwise, remove the 2x4 forms
and smooth all sides. Let the concrete set for a week.
E. Turn the caps over and score a groove in the
bottom 1 in. From the edge and about 1/4 in. deep to help water drip off. Use a
circular saw and a masonry blade.
Here are a few more tips to help your concrete work go smoothly.
-
Wear rubber gloves, goggles, long pants and a long-sleeve shirt to protect your skin.
-
Wet the forms before pouring the concrete.
-
Place the forms on a flat, level surface. Wet concrete will lie level when you settle the mix with a hammer (Photo C).
-
Protect the fresh concrete from rain and direct sun.
-
Pour the concrete in the morning. The lower temperatures will prevent the concrete from setting too fast and give you more finishing time.
-
Let the caps set for at least a week to harden.
Step by Step Photos

Click image to enlarge.
1. Pry off the
exterior siding. (Cut it to fit later.) Then cut the 2x10 ledger board to
length and align it with a level chalk line about 3 in. below the door sill.
Tack it in place with 16d galvanized box nails.

Click image to enlarge.
2. Mark the
joist positions according to your plan. Then predrill 3/8-in. holes for the
1/2-in. lag screws. Lag-screw the ledger board to the house, using two screws
between each joist. Slip the deck flashing in place. Align each joist hanger
with a joist scrap, and fasten one side with 16d galvanized nails. Purchase
special joist hangers for the ends that have the flanges turned
in.

Click image to enlarge.
3. Cut and
temporarily tack the outer frame of the deck together with 16d galvanized
nails. Level the frame, using blocking to support it. Next, square the frame by
shifting the outer edge side to side until the diagonal measurements are
equal.

Click image to enlarge.
4. Mark frame to accurately
position them. Paint a your footing locations, using the deck cross with spray
paint. Extend the cross beyond the diameter of the footing so you can easily
keep the hole aligned as you dig. Disassemble the frame and dig your
footings.
CAUTION: Call your utility companies and have the utility lines marked before you dig the holes.

Click image to enlarge.
5. Insert
forming tubes into the footing holes, then reposition the deck frame, again
leveling and squaring it. Tack one side of the mudsill anchors to the frame.
Slide the forming tubes up to the bottom of the frame and screw them to a pair
of temporary 1x4s to hold them in place. Fill the tubes with concrete, smooth
the tops and let the concrete harden overnight. Check the frame for level the
following morning (the concrete may shrink slightly as it cures), shim if
necessary to level, and double the beams where required. Then permanently
fasten the mudsill anchors to the frame with joist hanger
nails.

Click image to enlarge.
6. Cut and
install the 2x10 joists, sliding them into the joist hangers. Drive 1-1/4 in.
galvanized joist hanger nails into the joists and 16d galvanized box nails into
the ledger, filling all the nail holes in the hangers. Nail blocking between
the joists with 16d galvanized nails, alternating between the sides formed by a
chalk line snapped across the center line of the deck.

Click image to enlarge.
7. Assemble
the 2x6 knee walls according to the plan using 16d galvanized nails. Sheathe
the outside with 1/2-in. treated plywood, securing it every 8 in. with 8d
galvanized box nails. Snap chalk lines on the plywood at every stud to make
sure your nails hit solid wood.

Click image to enlarge.
8. Tip the
walls into place and plumb them, shimming under the bottom plate as needed.
Nail the bottom plate to the deck framing every 16 in. with 16d nails.
Nail the overhanging plywood into the deck framing with 8d nails. Then nail the inside plywood sheathing to the walls.

Click image to enlarge.
9. Staple No.
30 asphalt-impregnated felt to all the wall surfaces. Then install metal lath
horizontally with the cup of the extrusion aiming upward. Nail it every 8 in.
with 1-1/4 in. galvanized roofing nails, wrapping the corners a minimum of 12
in. and overlapping each sheet a minimum of 4 in.
10. Mix the mortar according to the directions on
the sack and scoop it onto a hawk. Hold the hawk against the wall, and slide
the mortar onto the wall with a steel trowel. Firmly press the mortar into the
lath, completely covering it by a good 1/8 in. Work fast. Have a helper mix
mortar while you spread it.
11. Scratch
horizontal lines into the mortar with a rake (or scarifier) while the mortar is
still soft.

Click image to enlarge.
12. Install
the decking. Drive two 16d galvanized casing nails through the 2x6 decking into
each joist. Set the nails slightly below the surface with a nail set. Start at
the step of the lower deck, work toward the house, then align the boards of the
upper deck to the lower and work away from the house. Straighten bowed boards
by drawing them toward you with a chisel driven into the joist. Then nail,
using a nail for a spacer between boards.

Click image to enlarge.
13. Snap level
chalk lines on the walls every 6 in. as rough guidelines. Apply the stone,
starting with the bottom corners and working your way up and out, staying in a
stair-step shape. Spread a pile of stones nearby to provide a wide
selection.

Click image to enlarge.
14. Butter
each stone by spreading mortar on the back. Press the mortar into the pores of
the stone as you draw the trowel toward you, drawing off the
excess.

Click image to enlarge.
15. Drop a
dollop of mortar onto the buttered stone and evenly spread a 1/2 to 3/4-in.
layer, completely covering the back.

Click image to enlarge.
16. Press the
stone into place, giving it a wiggle to seat it against the wall. Tap the stone
with the handle of the trowel for slight adjustments. Leave about a 1/2-in. gap
between stones. Using the point of the trowel, clean away excess mortar that
oozes out into the joint.
17. Cut the stone as needed with a hand-held
grinder equipped with a diamond-tipped masonry or tile blade. Firmly hold the
stone on plywood with your fingers well away from the blade.

Click image to enlarge.
18. Squeeze
mortar into all joints, filling them completely, using a grout bag. Start from
the top and work your way down. Twist the bag slightly with one hand as you
squeeze with the other hand to force the mortar out of the bag. Let the mortar
set long enough to hold a thumbprint.

Click image to enlarge.
19. Rake the
excess back about 1/4 in. from the face of the stone with a 3/8-in. pointing
trowel. Then brush loose, crumbled mortar away with a whisk
broom.

Click image to enlarge.
20. Set the
concrete caps in a bed of mortar on top of the wall. Tap them down to make the
tops even. Rake away the excess mortar with your pointing
trowel.